History of College Buildings/Blair Hall

Previous | Home | Next



Blair Hall

Constructed: 1882-1886, razed in 1961.

Architect:

Cost: $37,200 excluding grading and landscaping.

Initial Functions: housed college chapel, departments of chemistry, natural science, mathematics, and physics. A large museum was located in the central portion of the 3rd and 4th stories. The 2nd and 3rd levels held two encompassing galleries.